Skip to content

SUNSON · CUSTOMER CENTER

Technical support for your next production step

From enzyme selection to trial interpretation: find practical guidance, prepare the right information and connect with our technical team.

From selection to a documented trial

01

Define

Material, process stage and desired outcome.

02

Confirm

Preparation, activity basis and current technical guidance.

03

Compare

Control, trial range and consistent measurements.

04

Review

Interpret the results before changing production.

Guidance for each stage

Enzyme Selection

Record the raw material, target conversion or functionality, and process stage. Compare the stated activity together with its assay method; a higher activity number alone does not establish a better match.

Map where the enzyme contacts the material and what happens before and after treatment. Addition point, mixing, dilution and downstream processing should follow guidance for the exact preparation.

First identify whether the dose is expressed per mass of raw material, dry matter, liquid volume or another basis. Record activity units and the assay definition before using an addition calculator.

Check the calculation before the trial

For an agreed mass-based dose: preparation mass = substrate mass × dose fraction. Keep the units consistent; a percentage must be converted to a fraction. Activity-based dosing requires compatible activity units and the specified preparation activity.

The calculator converts an agreed dose. It does not determine a recommended dose, verify assay equivalence or validate the product for your process.

Establish the current process baseline before changing treatment. Select variables such as addition point, mixing, temperature or contact time within the approved product guidance.

Start with when the change appeared. Check raw-material lots, formulation, equipment settings, measurement method and product storage before concluding that enzyme activity is the cause.

Confirm the sample identity, available quantity and storage instructions when it arrives. Agree the test objective and comparison method before starting; receiving a sample does not establish process suitability.

Include the exact product where known, substrate, process conditions and acceptance criteria. Distinguish observations from assumptions so the team can identify the next evidence needed.

Before you begin

Not without checking the preparation, activity definition and dosing basis. Ask for guidance for the exact product and process.

Compare raw materials, actual operating conditions, product identity, storage and test methods. Send the control and trial records to the technical team.

No. Mixing, residence time and other process conditions can change with scale. Agree a suitable validation step before changing production.

Bring your process into the conversation

Share your material, product identity, operating conditions and target result. Include the measurements you already have.